Completion date: January 14, 2026
Location: Franklin, OH
Customer experienced water intrusion and moisture issues at the roofline, requiring inspection and drying.
Our team removed existing plywood to access and inspect the affected roofline area. Despite cold temperatures, drying progress was made. Dehumidification equipment (DH) was re-installed and configured to continue controlling and reducing moisture levels in the affected area.